Controlled Demolition

Planned dismantling of buildings and installations under the requirements that apply to the site

Controlled Demolition - Safety and Precision

Controlled demolition is a planned process for dismantling a building or part of it. Risks to adjacent structures and surroundings should be assessed in the appropriate plan.

When Is Controlled Demolition Required?

  • Demolishing old buildings for new construction
  • Dismantling parts of a structure - floors, wings, auxiliary buildings
  • Removing old installations and infrastructure
  • Demolition in densely populated areas
  • Dismantling factories and industrial buildings

The Demolition Process

Before demolition, check which surveys, plans, documents and approvals are required for the structure and site, then coordinate the work stages.

  • Preliminary engineering survey
  • Submitting applications and obtaining permits from authorities
  • Preparing a detailed demolition plan
  • Executing demolition in planned stages
  • Breaking and removing debris
  • Confirm cleanup and site-restoration scope in the quote

Safety

The plan should define required supervision, protective equipment, site fencing and measures for surrounding areas. Want to know which permits are required before starting? →


Controlled Demolition

Why this service

  • Check supervision required for the planned demolition
  • Check standards and approvals applicable to the site
  • Check the engineering planning and support required for the job
  • All structure types handled - concrete, steel, mixed
  • Check the removal method and waste destination in the quote
  • Define safety measures for the site and surroundings

Ready to get started?

Estimated price range in about a minute. No photos required, no obligation.

Accessibility settings

Text size
Default